Rate Analysis for Colour Washing Item: Applying Colour Washing with lime (three and more coats) to already plastered surface. Assumptions: Surface area of wall: 10 sq. m. Rates: Labour: 8 Rs per sq. m. White lime :300 Rs per Quintal Read More …
Category: Rate Analysis
Rate Analysis for White Washing with lime:
Rate Analysis for White Washing With Lime Item: Applying White Washing with lime (three and more coats) to already plastered surface. Assumptions: Surface area of wall: 10 sq. m. Rates: Labour: 5Rs per sq. m. White lime :300Rs per Quintal Read More …
Rate Analysis for Plaster of Paris (POP)
Rate Analysis for Plaster of Paris (POP) to interior wall about 2mm thick: Item: Applying Plaster of Paris about 2mm thickness to already plastered surface. Assumptions: Surface area of wall: 10 sq. m. Rates: Labour: 40Rs per sq. m. POP:3Rs Read More …
9. Rate Analysis for Brick Bat Waterproofing
The rate analysis of brick work is mainly depends on brick work rate. The Rate Analysis for brick bat waterproofing is mainly depend on the material used and the labour charges. Item Details: Brick bat waterproofing treatment 100mm thick in Read More …
8. TILING WORK RATE ANALYSIS
Tile work rate analysis is mainly depend on the area where the tiling is to be done. Tile work rate analysis is depend on the size and type of tile available in market. For different type of tiles, rate analysis Read More …
7. Rate Analysis of Plastering with Cement Mortar
Rate analysis of plastering with cement mortar is mainly depend on the thickness and area to be plastered. The quantity is to be calculate in plastering is mortar, sanala. The rate of the materials like cement, sand is to assumed. Read More …
1. Overhead Cost for project
Overhead Cost for project: Overhead cost for project is very important aspect in construction or in project. The overhead cost affect lots on entire construction cost if not planned well. In construction, Overhead cost for project results from the various sources like, Read More …
6. Rate Analysis of Brick Masonary: Half brick Thinckness
The Rate Analysis of Brick Masonary is depend on thickness of wall. In this article, the half brick thick wall is considered for the rate analysis. Rate Analysis Of Brick Masonary (For 110mm Thickness) Item Details: Brick Masonary 110mm Thick Read More …
5. Rate Analysis of Brick Masonary
The Rate Analysis of Brick Masonary is depend on thisckness of wall. Rate Analysis of Brick Masonary (For 230mm thickness) Item Details: Brick masonary 230mm thick in CM 1:5 Quantity Assumed: 10cu-m Rate Assumed, Cement: 280Rs per bag sand: 990 Read More …
4. Rate Analysis for Reinforcement steel:
Rate Analysis for Reinforcement steel is as follows, Item Details: Reinforcement steel work in RCC work Quantity Assumed: 1000kg Rate Assumed, Steel: 44Rs per Kg Binding wire: 65 Rs per Kg Item No. Item Explaination Quantity Unit Rate/unit Amount A Read More …
3. Rate Analysis for RCC in 1:1.5:3 (1:1:2)
Rate Analysis for RCC is depend upon the proportion used for RCC. For the different proportions the rate Analysis for RCC will be different and the rate per activity will be different: Rate Analysis for RCC in 1:1:2 Item Details: Read More …
2. Rate Analysis for PCC
PCC rate analysis is depend upon the proportion used for PCC. For the different proportions the rate Analysis for PCC will be different and the rate per activity will be different. PCC rate analysis will always depend on, Grade of Read More …